Rush jobs shouldn't take 3 hours to schedule

We automate production replanning for CNC and metal fabrication shops. What takes your scheduler 2-3 hours in Excel now takes 30 seconds.

THE PROBLEM

Your scheduler rebuilds the entire production calendar every time a rush job hits

  • Hours lost to manual replanning. Your scheduler spends 6-15 hours per week rebuilding schedules in Excel when rush jobs disrupt production flow.

  • Real costs adding up. Late delivery penalties, expedited freight, overtime labor, and lost throughput capacity cost your shop $50k-$200k annually.

  • ERP scheduling modules don't help. They're too complex, don't reflect shop floor reality, and get ignored. Your team exports to Excel anyway.

HOW IT WORKS

Schedule replanning in 30 seconds

Step 1:
Export your current schedule from your ERP or Excel
Step 2:
Upload to RushFlow. We resequence based on your constraints (machines, tooling, priority customers, delivery windows)
Step 3:
Review the optimized schedule
Step 4:
Import back to your system

TIME SAVED

2.5 hours per rush job × 3-5 rush jobs per week = 7-15 hours recovered weekly

WHAT YOU KEEP

Works with what you already have

  • No ERP replacement. We integrate with JobBOSS, E2 Shop System, Epicor, SHOPTECH E2, SAP, or Excel.

  • No staff training. Your scheduler's workflow stays exactly the same.

  • 5-day setup. From contract signature to first automated schedule.

early access

Accepting 5 pilot shops for March 2026 launch. Setup 50% off, same monthly pricing.

Meet with us

15-minute call to see if rush job automation fits your shop. No pressure, no commitment.

[email protected]
(440)-688-1283
© 2026 RushFlow Systems